Bridge may 2006 despite everything that s been written on the proper way to make dry pack mortar there still seems to be a great deal of uncertainty on the part of weekend warriors and even a few pros have trouble with the concept.
John bridge drypack shower floor.
Archive problems with dry pack shower floor tile forum advice board ceramic tile advice forums john bridge ceramic.
The site has a two pronged mission.
Learn how to work with dry pack mortar to float a shower pan.
To better inform the general public on the intricacies of the tile industry and to provide a meeting place for tile and stone professionals where information might be freely exchanged john bridge tile forums provides the venue and everyone be they professional tile installer manufacturer s representative do it yourselfer or interested consumer is.
I have been slowly constucting a shower using info from searching this forum.
Making deck mud dry pack mortar for tiled shower floors and other uses john p.
Want to lock the bed in tight and strong with no grit residue the nxt day saturate the wire lathe prior to dumping your dry pack it also keeps the mud very workable after screeding a section i follow up with wood float to sand out high spots then final with steel trowel to a fine finish a step some guys.
I was thinking of buying that auger where you can mix dry pack in a 5 gal bucket or a 3 5 cu ft barrel type cement mixer.
Despite what you may think water can and will penetrate all the way through the tile mortar and concrete above the shower pan making its way down to the shower pan.
Inches top layer deck mud thickness 1 25 1 50 1 75 2 00 2 25 2 50 inches preslope layer deck mud thickness at wall 0 50 0 75 1 00 1 25 1 50 1 75 2 00 2 25 2 50 inches.
The pre slope is a slight slope of the floor draining toward the shower drain created with dry pack cement before the shower pan is installed.
But the article and pictures in john bridge s tile your world book show the bench built on top of the pvc liner before the final layer of floor is poured.
I am needing to pour a lot of dry pack on the pre slope of a shower floor which is 60 x92.
I wanted to work on top of the floor instead of the liner so that.
It is a traditional with a mortar preslope then pvc liner then drypack over the pvc liner.
You will learn how to properly mix dry pack mortar form the screeds pull the mortar to ensure a consistent pitch or perfectly flat substrate.
I recently had a dry pack 20 sq.